Steel Sheet Metal Roof Wall Panel Roll Former Glazed Tiles Roll Forming Machine Roofing Sheet Making Machine
Steel Sheet Metal Roof Wall Panel Roll Former Glazed Tiles Roll Forming Machine Roofing Sheet Making Machine
Couldn't load pickup availability
1.The price only for reference, the specific cost based on your requirements and the destination port, please contact us for more product details and quotations
2.We ship you by sea !!!
3.Door to door please leave message or whatsapp or email for price !!!

Display of final products:

1.Technical parameters :
|
1. |
Name |
glazed steel sheet forming machine |
|
2. |
Raw Materil |
Galvanizd steel |
|
3. |
Thickness |
0.3-0.8mm or as request |
|
4. |
Roller Station |
9-16Steps |
|
5. |
Shaft Material |
45#Steel |
|
6. |
Roller Material |
45#steel heat treated |
|
7. |
Transport |
Chain |
|
8. |
Forming Speed |
4-5m/min |
|
9. |
Motor Power |
5.5kw or customized |
|
10. |
Voltage |
380V 50HZ 3Phase |
|
11. |
Cutting System |
Hydraulic Cutting |
|
12. |
Control System |
Detal PLC |
|
13. |
The whole line :Manual decolier, roll forming machine, hydraulic station, PLC control system, Hydraulic cutter, run-out-table |
|
2.Details show:
a. Feeding and decoiling
b. Forming

c. Embossing and Cutting

d. Runout table and Spare parts

3.Note for use and maintenance
A.Notes:
1),before use,you must check whether all connections are steady,whether bolts and nuts are tightinstallation.when start the machine,you must make sure there are enough lubrication oil in the case.
2),when start the machine commissioning,the machine should run idle,then check it carefully such as noise,vibration and whether the oil window works smoothly,whether every parts movement coordination.
3),You must cut off power when install the mould,move the motor belt and big gear by hand,turn the workbench and make sure the slide up to the highest point.
4),It's better to arrange a support between workbench and slide bottom,just in case dropping and accident happens.
B.Maintenance and Service :
1),Operation must in accordance with the operating rules
2),The machine must keep clean,antirust oil must be daubed in the no spray paint parts to avoid rusting.
3),Bearing of motor must be lubricated regularly,and checks the electrical parts in order to work smoothly.
4),Check the V belt,handles,knobs,bottons,and if damaged or badly worned,you should replace in time and supply the spare parts for necessary demands.
5),Clean and lubricate the machine before after work everyday,prohibit unauthorized people to operate the machine, shut down the machine and power it down while there is no operator in the post.





1)Package standard:
|
Control box and easy damage parts |
protective paper and waterproof packaging material,or wooden boxes |
|
Main forming device |
waterproof material |
|
Hydraulic pump and spare parts |
paper boxes with waterproof material. |
2)Delivery:
We will arrange the shipment within 30 working days upon confirmation of purchasing order
or recepit of deposit.






Share
